97色色5月天五月 激情 丁香|久久区 综合区人人99亚洲欧美|色综合AV在线伊人网站在线观看|粉嫩在线观看免费2018天堂在线|一区在线极品AV不卡AV地址在线|99免费吃奶五月激情狠狠干|国产又黄又爽欧美激情综合|福利片一二三九一久久国产

Current Location:海泰熱工 > ENGLISH > NEWS > Industry News >

常州市海泰熱工設(shè)備有限公司Haitai ReGong Industry

MR Fan 13961292233
0519-86058319
czhtrg@sina.com
Heping Industrial Park, Tianning District, Changzhou City (No. 518 Qinglong East Road)

常州市海泰熱工設(shè)備有限公司Search The Product

Focus on casting furnace

Use and structure of mold preheating furnace

Time:2019-09-09    Hit Count:   
I. Equipment use and structure: The mold preheating furnace is mainly used for preheating aluminum alloy and copper alloy iron tires. It adopts electric resistance or natural gas (non-hot air) heating trolley type. The basic structure should include: furnace body (including furnace lining), Furnace door, furnace car, furnace drive, heating device, sealing device, temperature control and recording system. ≤2h
Second, the main part of the furnace
The furnace is mainly composed of main parts such as furnace body (including furnace lining), furnace door, furnace car, furnace drive, heating device, hot air circulation system, sealing device, temperature control and recording system, and power system.
1. Furnace lining: The furnace lining adopts a full-aluminum silicate refractory fiber needle-punched blanket with excellent heat insulation performance, and is combined into a full-fiber lining through special construction. The refractory fiber has a temperature resistance rating of ≤600 °C.
The furnace body with full refractory fiber structure has excellent energy-saving performance. Compared with the same size of the brick resistance furnace, energy saving is about 30%, and the heating rate is doubled.
The full refractory fiber structure has good thermal shock resistance, resistance to rapid cooling and rapid heat, and full fiber bonding technology, which is sturdy and durable, and there is no fear of fiber shedding, and the service life is longer than that of the brick body.
The lining is very convenient to repair. If it is damaged by mechanical collision, it can be used as long as it is partially repaired. The lining also has the characteristics of simple installation and short construction time.
2, specifications and standards: in the design, manufacture, purchase of purchased parts, installation and other processes in strict accordance with the relevant national standards and standards.
Third, the scope of equipment supply:
1. Furnace body: design, manufacture, installation and commissioning of preheating furnace.
2. Control system: The control cabinet below the main power switch cabinet, the manufacturing installation and commissioning of the furnace electrical control system.
TOP
Copyright ©Changzhou Haitai Thermal Equipment Co., Ltd. All rights reserved??ICP********??Sitemap

RANRAN Technology